Project Leadership
|
Our responsive, diversified
team can manage every aspect
of your project at every
stage, from total oversight
to client support as an
on-site contractor to
emergency response. |
Engineering/Design
|
We provide superior
engineering services, as
well as support for your
in-house team. |
Project Management
|
Our project management team
assures all projects are
completed safely, on time,
within budget and to our
customers’ satisfaction. |
Craftsmen and Field Specialists
|
Each member of the
Consolidated team is a
professionally trained,
certified specialist with a
demonstrated commitment to
safety, superior
craftsmanship and
top-quality performance. |
Construction, Repair and Maintenance
|
From highly complex
construction projects for
oil and power plant
companies to the simplest of
repairs, Consolidated leads
the way with experience and
expertise. |
 |
Above-Ground Storage
Tanks
|
-A.P.I. 650,
A.P.I. 653,
A.P.I. 620, U.L.
142 |
|
-AWWA D100-96
|
|
-Welded Steel
Tanks for Water
Storage |
|
-New
Construction
Design and
Erection |
|
-Repairs,
Retro-Fits and
Relocations |
|
-Bottom Design
Repair and
Installation |
|
-Secondary
Containment |
|
-Leak Detection |
|
-Cathodic
Protection |
|
-Floating Roof
(Internal and
External)
Design, Repair
and Installation |
|
-Floating Roof
Seal Systems |
|
-Cone Roof
Design, Repair
and Installation |
|
-Shell
Modifications/Replacements |
|
-Roof Drain
Systems |
|
-Jacking and
Leveling |
|
-Fire Protection
Systems |
A.S.M.E. Pressure Vessel,
Heat Exchanger & Boiler Code Work
|
-Code Stamps
“R,” “U,” “H”
and “S” |
|
-Design, Repair,
Alter, Re-Rate
and New
Construction Per
A.S.M.E. Section
I, Section VIII
Division I and
Section IV |
|
-Design,
Fabricate and
Install
Refinery,
Chemical and
Terminal Piping
Per Sections
B31.1 and B31.3 |
|
-TEMA Heat
Exchanger, Build
and Re-tube |
|
-Section I
Boiler Repairs
and Alterations |
|
|
|
Fabrication
|
Consolidated maintains
complete control of your
project by performing all
fabrications in-house. Our
state-of-the-art fabrication
facility, housed on 10
acres, is fully equipped
with a 20-ton overhead crane
and 80,000 square feet of
lay-down area. Our
multi-skilled shop
supervisors and craftsmen
possess the training and
expertise required to
support our field services
division in all facets of
process, heat transfer,
pressure vessels and product
storage of the
petrochemical, steel and
power industries.
|
-Plasma Shape
Burning With
Direct Numeric
Control (D.N.C) |
|
-Plate
Rolling/Forming
|
|
-Pipe Rolling |
|
-Structural
Shape Forming
|
|
-Plate Shearing |
|
-Machining |
|
-Weld Processes
Include SMAW,
SAW, FCAW, GMAW,
GTAW, OFW |
|
 |
|
Facility Maintenance
-Refinery and Chemical
Plants
-Power Boiler Facilities
-Heat Exchanger Rebuilds
-Air Cooler Rebuilds
-Preventative Maintenance
Programs
-Refinery Chemical and
Boiler
-Distillation Tower Rebuilds
-Loading Rack
Rebuilds/Maintenance
-Vapor Recovery Maintenance
-Pressure Vessels |
Inspection
-A.P.I. 653 Inspections
-EPA Seal Surveys
-Magnetic Flux Leakage
-Ultrasonic A & B Scan
-Tracer Gas Testing
-Laser Technology
-A.W.S Certified Welding
Inspectors
-A.S.M.E. Section I and
Section VIII Division 1
Mechanical Integrity
Programs
-API 570 Process Piping
Integrity Programs
-Tank Inspections
-Floating Roof Seals
-Floating Roofs (Pontoons
and Pans) |
 |
Pipeline Maintenance
|
|
INTEGRITY REPAIRS (Per API
1104)
|
-Excavations |
|
-Weld Repairs |
|
-Sleeves |
|
-Coatings |
PUMP STATION
|
-Modifications |
|
-Replacements |
|
-New
Construction |
BREAK OUT TANKS
|
-API 653
Inspection |
|
-API 653
Repairs/Upgrades
|
|
Process Piping Systems
DESIGN, CONSTRUCT AND REPAIR
|
-Loading Racks |
|
-Blending
Systems |
|
-Delivery Lines |
|
-Receipt Lines |
|
-Manifolds |
|
-Vapor Recovery
Units |
|
-Fire
Suppression
Systems |
|
-A.S.M.E. B31.1,
B31.3, B31.5 |
|
-A.S.M.E.
CERTIFICATE
HOLDER |
Structural Steel
|
-Pipe bridges
and pipe bents |
|
-Platforms,
ladders and
staircases |
|
-Loading racks
with canopies |
|
-Structural
design per AISC
|
|
-In-house
structural
detailing
capabilities |
|
|